Server rack battery 51.2 v 200ah LiFePO4 Lithium Storage Battery
With the rapid development of renewable energy, the demand for energy storage systems has also shown explosive growth. These market demands provide a huge development space for the Lithium Battery industry.
1)Battery model: | FT-48200-5U |
2)Normal Capacity: | 200 ah |
3)Normal Voltage: | 51.2 v |
4)Energy: | 10.24 kwh |
5)Charging Voltage: | ≤58,4 v |
6)Shell materials: | Q235 |
7)Max. Continuous Charge &Discharge Current: |
0.5 c(100a) |
8)Operation Temperature Range(Charge): | 0-45 ºC |
9)Operation Temperature Range(Discharge): | -20~65 ºC |
10)Dimensions: | Approx.442*580*221 mm(17,4*22,8*8,7in)Excluded terminals, handles & mounting ears) |
11)N.W: | Approx.85 kg |
2.Widely used in:
Solar energy storage,Home energy storage,Wind energy storage,Hydro energy storage,Off-grid system,Solar power system,Camping,Island,Outdoor power supply,Telecom,base station,Data centers,Server rooms,UPS(Uninterrupted Power Supply),Backup System,Forklift,Golf Cart,RV,AGV,electric boats,Marine,Medical Equipment etc Hot applications.
The timing and price factors of installing solar panel?
1)The timing of installing solar panel:
Typically, it takes two to three weeks for a contractor,first to initially arrange a roof inspection and obtain approval, to finally install the panels into place. Homeowners should be prepared for occasional power outages.
2)The price factors of installing solar panel:
1)Size of the overall system.
2)Type and quality of equipment desired.
3)Geographical location.
4)Incentives in your area/country.
5)Professional installers or DIY fees, etc.
Buy now,please feel free to contact us,thank you.
Contact: Cindy Huang
Phone: 0086-13727008595
Tel: 0086-0756-6835803
Company: Zhuhai Future Energy Technology Co.Ltd
Add: Fushan Industrial Park,Doumen District Zhuhai.GD.China