info@energy-ft.com

48 v 51.2 v LiFePO4 Battery

  • Server rack battery 51.2 v  200ah LiFePO4 Lithium Storage Battery
  • Server rack battery 51.2 v  200ah LiFePO4 Lithium Storage Battery
Server rack battery 51.2 v  200ah LiFePO4 Lithium Storage BatteryServer rack battery 51.2 v  200ah LiFePO4 Lithium Storage Battery

Server rack battery 51.2 v 200ah LiFePO4 Lithium Storage Battery

  • Chemistry: Lithium Iron Phosphate
  • Rated Voltage:51.2 v
  • Rated Capacity:200 ah
  • Combine Method:16s1p
  • Product description: Server rack battery 51.2 v 200ah LiFePO4 Lithium Storage Battery is from Zhuhai Future Energy which is a professional Lithium Battery,Solar Battery,LiFePo4 Battery,Storage Battery,Lithium ion Battery
  • INQUIRY

Server rack battery 51.2 v  200ah LiFePO4 Lithium Storage Battery

With the rapid development of renewable energy, the demand for energy storage systems has also shown explosive growth. These market demands provide a huge development space for the Lithium Battery industry.


1.Specifications:

1)Battery model: FT-48200-5U
2)Normal Capacity: 200 ah
3)Normal Voltage: 51.2 v
4)Energy: 10.24 kwh
5)Charging Voltage: ≤58,4 v
6)Shell materials: Q235
7)Max. Continuous Charge &Discharge Current:

0.5 c(100a)

8)Operation Temperature Range(Charge): 0-45 ºC
9)Operation Temperature Range(Discharge): -20~65 ºC
10)Dimensions: Approx.442*580*221 mm(17,4*22,8*8,7in)Excluded terminals, handles & mounting ears)
11)N.W: Approx.85 kg



2.Widely used in:

Solar energy storage,Home energy storage,Wind energy storage,Hydro energy storage,Off-grid system,Solar power system,Camping,Island,Outdoor power supply,Telecom,base station,Data centers,Server rooms,UPS(Uninterrupted Power Supply),Backup System,Forklift,Golf Cart,RV,AGV,electric boats,Marine,Medical Equipment etc Hot applications.

The timing and price factors of installing solar panel?

1)The timing of installing solar panel:

Typically, it takes two to three weeks for a contractor,first to initially arrange a roof inspection and obtain approval, to finally install the panels into place. Homeowners should be prepared for occasional power outages.


2)The price factors of installing solar panel:

1)Size of the overall system.

2)Type and quality of equipment desired.

3)Geographical location.

4)Incentives in your area/country.

5)Professional installers or DIY fees, etc.


Buy now,please feel free to contact us,thank you.




Scan the qr codeClose
the qr code